Ion-science SF6 P1:p Manual do Utilizador Página 12

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 42
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 11
SF6 P1:p MANUAL Ion Science Ltd
11 of 41
Unrivalled Detection. www.ionscience.com
Putting into operation
Preparations for putting the P1:p leak detectors into operation are limited to connecting the handset, the
sensor, and, if available, the mains power. When connecting the handset and the sensor you must ensure
that the markings on the plug and socket the line up with each other and that the slide piece of the plug has
reached the locking position, in which it is completely in contact with the collar of the socket.
When briefly pressing the red On/Off button, the instrument will start. Approximately 20 to 30 seconds after
the start-up screen has been displayed, the normal operating screen will be displayed. Should this not be the
case, then please read the message on the screen as well as the information provided in the Chapter
"Possible malfunctions when starting the system" and "Switching off when there is a failure".
Start screen
„Search Mode“ display
„Measuring Mode“ display
Vista de página 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 41 42

Comentários a estes Manuais

Sem comentários